Strengthening scheme for sealing and waterproofing system of doors and windows

Created on 06.13
1. Three waterproof barrier designs
The first layer (structural waterproofing): a combination of window sill panels and sprinkler panels to divert rainwater to the outer wall surface;   
Second layer (waterproof material): Use Hannoband ®- 3E adaptive moisture balance sealing tape, blocking capillary water seepage;   
The third step (process waterproofing): Brush permeable waterproof coating (such as permeable crystalline type) around the window frame to form a composite layer with sealant.   
2. Drainage system configuration
Drill a drainage hole with a diameter of 5mm on the sliding track (spacing ≤ 300mm), and install an invisible drainage cover to avoid blockage.